GM – ED Sand Booth Modifications


To support the ground-level expansion of the ED Sand Deck, we designed and fabricated a custom exhaust duct system. Engineered to meet airflow requirements within tight spatial constraints, the solution maximized worker ergonomics without compromising performance.

Download Datasheet

Project Overview

Scope of Work

Ground level of ED Sand deck was extended, requiring modifications to the exhaust ductwork. Due to space constraints of the booth workers and required flow rate of exhaust, a unique duct design was engineering and fabricated to allow for the most ergonomic working space while maintaining adequate exhaust.

  • Exhaust Duct Extensions
  • Booth Plenum repairs
  • Custome Modifications

Project Accomplishments

required airflow rates while maximizing worker ergonomics within tight booth conditions.

  • Unique Shaped Duct
  • Tight Booth Restrictions
  • Confined Space Work

Partners

Thanks to our project partners for their expertise, collaboration, and commitment to excellence

  • OCC
  • Ductworth & Associates
  • HMW fab & install trades

Get In Touch With Us To Start Your Project

Contact Us