Industry:

Automotive

Location:

Michigan Assembly Plant

Construction:

Retro Fit

Project Size:

$142,000

GM – DVT Alignment Integration

Demo and installation of a new DVT booth and alignment machine, including modifications to supply and exhaust ductwork and pit supply duct to declassify the pits as confined spaces. Instead of a full booth, HMW fabricated and installed custom sound walls around the machines to provide hearing protection.

Download Datasheet

Project Overview

Scope of Work

Ground level of ED Sand deck was extended, requiring modifications to the exhaust ductwork. Due to space constraints of the booth workers and required flow rate of exhaust, a unique duct design was engineering and fabricated to allow for the most ergonomic working space while maintaining adequate exhaust.

  • Exhaust Duct Extensions
  • Booth Plenum repairs
  • Custome Modifications

Project Accomplishments

required airflow rates while maximizing worker ergonomics within tight booth conditions.

  • Unique Shaped Duct
  • Tight Booth Restrictions
  • Confined Space Work

Partners

Thanks to our project partners for their expertise, collaboration, and commitment to excellence

  • OCC
  • Ductworth & Associates
  • HMW fab & install trades